Wednesday, July 5, 2017

It's running!

Everything is back together now, and the car is running.






There a few things still left to do, like:


  • Hookup the A/C controller to the Honda dash switches
  • Charge the A/C and check for leaks
  • Plug in the BMS boards (still getting built)
  • Write some code to integrate the BMS results with the control of the on-board charger.
  • Change the gauge cluster software to Torque and make new gauge layout in the UI

Saturday, June 24, 2017

Rear pack installed!

I finished wiring up the back of the car. The rear pack is in! I also installed a mid-pack service switch.



Sunday, May 21, 2017

Rear Battery Pack Started

2 of the rear 16s modules are now assembled and wired for the BMS. I built a nice carrier to hold them down in the rear battery box.







The final 2 8s modules will sit on top of this with a mid-pack service switch in between.